Forest Road 3 Month Closure at Three Legged Cross

Forest road is to be closed at the junction with Maidenhead Road (locally known as the Three Legged Cross junction) for 7 months, the work is due to start on the 9th of January and expected to last until 13th April 2017.

The closure is to allow the construction of a new junction that will serve the recently constructed Warfield Link Road which is part of the infrastructure improvements surrounding the on-going development of 2,200 homes at the Cabbage Hill / Harvest Ride site.

Amen Corner / Coppid Beach 12 Months of Road Works

Details on the link road can be viewed on the Bracknell Forest website using the following link:

http://www.bracknell-forest.gov.uk/warfield-link-road-business-case.pdf

 

 

1 thought on “Forest Road 3 Month Closure at Three Legged Cross

  1. Pingback: Amen Corner / Coppid Beach 12 Months of Road Works – Your Forest – Supporting the residents of Bracknell Forest

Leave a Reply

Your email address will not be published. Required fields are marked *